Jackpilot
01-02-2008, 01:50 PM
I put this on another TQ thread, but think it can help as stand alone.
Here is one way to do it, all metal:
The rod B slides through the block A which is bolted on the lever.
B is lifted to disengage from the dented quadrant and the spring (compression) brings it back down on the next notch...easy cheap.
http://i24.photobucket.com/albums/c29/jackpilot/springloading.jpg
Here is one way to do it, all metal:
The rod B slides through the block A which is bolted on the lever.
B is lifted to disengage from the dented quadrant and the spring (compression) brings it back down on the next notch...easy cheap.
http://i24.photobucket.com/albums/c29/jackpilot/springloading.jpg