PDA

View Full Version : Nearing completion now...



Michael Carter
11-11-2006, 09:31 PM
A test fit to the control stand.

The flap mechanism and the slider pot and linkage is installed. Now I have to fit and install the stab trim cutout/normal switches and then finish the flap mechanism housing.

I ordered the Beta Innovations Plasma MM2 to interface with. I was going to go with the FDS input modul, but the BI is much less expensive for the same capabilities.

http://i63.photobucket.com/albums/h146/boeing722/Throttlefit1.jpg

http://i63.photobucket.com/albums/h146/boeing722/Throttlefit2.jpg

Matt Olieman
11-11-2006, 11:09 PM
Impressive, indeed :)

Thanks for the photos.

Michael Carter
11-12-2006, 12:41 AM
Thank you Matt. It's been a long time coming.

Michael Carter
11-15-2006, 11:44 PM
Just waiting on the electronics now. The card shipped today, so it won't be long now.

I still have a few placquards to mount.

http://img182.imageshack.us/img182/1367/boeing1uz8.jpg