I think I mentioned here before that my 737-300 project is pretty much on hold until I have suitable housing for it. Been a long time coming with various delays and a lot indecision on our part, but now we have this much...
Overhead door not in yet, hopefully that will be tomorrow. 20 x 25 x 9 (at the eaves, 11 at the peak) Then it has to have another termite treatment (yes, the county really does require treatment to protect my steel building and concrete slab/foundation against termites!), then final inspection. Finally I can concern myself with insulation, electrical and A/C. One of these days maybe I can get around to working on the simulator!
Should be a good home for my project....
...Dave
Dave Jones
Fort McCoy, Florida USA
Overhead door not in yet, hopefully that will be tomorrow. 20 x 25 x 9 (at the eaves, 11 at the peak) Then it has to have another termite treatment (yes, the county really does require treatment to protect my steel building and concrete slab/foundation against termites!), then final inspection. Finally I can concern myself with insulation, electrical and A/C. One of these days maybe I can get around to working on the simulator!
Should be a good home for my project....
...Dave
Dave Jones
Fort McCoy, Florida USA